Wednesday, November 30, 2011
Day 3
Well just drove by the house on the way to school, and well no one there. Hopefully the project manager and the subcontractor made it to the house.... Sure would like to see some work take place.
Tuesday, November 29, 2011
Day 2
Well drove by the house on the way to get Andrew from school, and it looks like the contractors haven't been over. No dumpsters yet outside!!!!
After talking with my dad, I found out no one had been to the house today. So I called the contractor, and he said he would be at the house tomorrow with the subcontractor. He also said he'll have a list for me Thursday or Friday. That way construction can start either friday or Saturday.
After talking with my dad, I found out no one had been to the house today. So I called the contractor, and he said he would be at the house tomorrow with the subcontractor. He also said he'll have a list for me Thursday or Friday. That way construction can start either friday or Saturday.
Monday, November 28, 2011
Day 1 - take two
Today I met the contractor and movers at the house..... They are moving things out this morning, and then the project manager is going to meet with the subcontractor this afternoon... Yippee!!
Tuesday, November 22, 2011
Day 1 update
Well day 1 did not start yesterday as planned.... The project manager called mom this morning, and told her that they will be over Monday morning to move things out along with starting construction.....
So now to wait until Monday!
So now to wait until Monday!
Monday, November 21, 2011
Day 1
Today John and I finished putting up the wall. Plus my parents finished moving everything out for the construction movers to come and get.... They should be over sometime after 2pm...... Then construction demo begins tomorrow hopefully!!!
Sunday, November 20, 2011
Thursday, November 17, 2011
Contracts
Today mom & dad are going to sign the contract with the contractors. With this being done, construction will start next week.....
Wednesday, November 16, 2011
Removing the mural
Yesterday I worked on removing the mural from the living room wall. If you look back at BEFORE pictures of the room, you can see a bit of it in one picture. I still have a little more to finish on it today. I will post pictures later of the progress.
Monday, November 14, 2011
Contrators are coming
Mom talked to the contractors this morning, and they told her they can come out to the house start next week to start work........ So if that is what happens and they keep to estimated work time (6 weeks), the house (contractors part) should be complete the first week in January....... I am hoping so because I am planning on using the house for Meadow 5th birthday party at the end of January :)
Sunday, November 13, 2011
House Thoughts - update
House thoughts
1. Running toilet & shower in downstairs bathroom
2. Flooring in upstairs bathroom
2a. New shower walls upstairs
2b. Remove side wall of little closet to make it more open
3. Fix central heat and air in house
4. Garage doors
5. New lights fixtures throughout house (except downstairs bathroom)
5a. New fixture on front & back porch
(DONE) 6. Two small rooms into 1 large room
6a. New closet for new room
7. Expand master bedroom closet
8. New banister up the stairs & hallway
9. Seal off balcony doors and pull down balcony
10. Privacy fencing both sides of yard (upper only)
10a. Privacy fence the front and run fencing up driveway
11. Replace chain fence in backyard
12. Get rid of all brush in backyard and start growing grass
13. Patio off back door
13a. New back door (possibly glass)
14. All junk on sides of house must go and start growing grass again
15. Appliances in kitchen - frig, stove, dishwasher
16. New front loading washer & dryer set
17. Laundry platform (see pinterest acct)
17a. Laundry cabinet storage (see pinterest acct)
17b. New doors for laundry area
18. Front porch roof fixed
19. Swimming pool in backyard for kids!!!!!!
19a. Deck around pool
20. Puppy for Andrew & John
21. Remove all bushes and plants along front of house
21a. Plant either hedges along front of house or some type of rock flowers garden
22. Put shelves in end closet for extra storage
22a. Put door on closet
23. Build a storage bench under window in upstairs hallway
24. Alarm system
24a. Smoke alarms/carbon monoxide detectors
24b. New locks on doors
25. Door bell
26. New front door
27. Clean front window
28. Either replace or paint all baseboards, beams, and trim work
29. Clean fireplace
29a. Repaint brass doors
29b. Update mantle
30. Paint outside of house
30a. Paint kitchen one color
30b. Paint living room, stairs, hall, & bathrooms one color
30c. Andrew room - paint grey with OU vinyl accents
30d. Meadow room - paint light purple with butterfly vinyl accents
30e. Office room -
30f. Master room -
31. Ceramic Flooring in kitchen & downstairs bath matching (possibly match upstairs as well)
32. Multiple four wheelers
33. Cut sunroof hole
33a. Possibly put in second sunroof on opposite side
34. Change track lights to ceiling mounts
35. Install bead board in office
35a. Instal bead board in kitchen
36. Programmable thermostat
37. Convert front closet to mud room
38. Replace or paint all bathroom fixtures (sink, tub, downstairs light)
1. Running toilet & shower in downstairs bathroom
2. Flooring in upstairs bathroom
2a. New shower walls upstairs
2b. Remove side wall of little closet to make it more open
3. Fix central heat and air in house
4. Garage doors
5. New lights fixtures throughout house (except downstairs bathroom)
5a. New fixture on front & back porch
(DONE) 6. Two small rooms into 1 large room
6a. New closet for new room
7. Expand master bedroom closet
8. New banister up the stairs & hallway
9. Seal off balcony doors and pull down balcony
10. Privacy fencing both sides of yard (upper only)
10a. Privacy fence the front and run fencing up driveway
11. Replace chain fence in backyard
12. Get rid of all brush in backyard and start growing grass
13. Patio off back door
13a. New back door (possibly glass)
14. All junk on sides of house must go and start growing grass again
15. Appliances in kitchen - frig, stove, dishwasher
16. New front loading washer & dryer set
17. Laundry platform (see pinterest acct)
17a. Laundry cabinet storage (see pinterest acct)
17b. New doors for laundry area
18. Front porch roof fixed
19. Swimming pool in backyard for kids!!!!!!
19a. Deck around pool
20. Puppy for Andrew & John
21. Remove all bushes and plants along front of house
21a. Plant either hedges along front of house or some type of rock flowers garden
22. Put shelves in end closet for extra storage
22a. Put door on closet
23. Build a storage bench under window in upstairs hallway
24. Alarm system
24a. Smoke alarms/carbon monoxide detectors
24b. New locks on doors
25. Door bell
26. New front door
27. Clean front window
28. Either replace or paint all baseboards, beams, and trim work
29. Clean fireplace
29a. Repaint brass doors
29b. Update mantle
30. Paint outside of house
30a. Paint kitchen one color
30b. Paint living room, stairs, hall, & bathrooms one color
30c. Andrew room - paint grey with OU vinyl accents
30d. Meadow room - paint light purple with butterfly vinyl accents
30e. Office room -
30f. Master room -
31. Ceramic Flooring in kitchen & downstairs bath matching (possibly match upstairs as well)
32. Multiple four wheelers
33. Cut sunroof hole
33a. Possibly put in second sunroof on opposite side
34. Change track lights to ceiling mounts
35. Install bead board in office
35a. Instal bead board in kitchen
36. Programmable thermostat
37. Convert front closet to mud room
38. Replace or paint all bathroom fixtures (sink, tub, downstairs light)
It has started
Well, it has started...... Today John, the kids, and I began demolition upstairs in Bedroom B & C. Our plan is to take down the closets between the two rooms along with walling up one of the hall doors. This way it becomes one large room for Meadow.......
As you can tell from the pictures the frame of the closet is now gone. We just need to finish taking down the ceiling frame and wall off one of the doors. The contractors are going to sheet rock the walls and replace all the carpeting.
**FYI - contractors still have not started**
As you can tell from the pictures the frame of the closet is now gone. We just need to finish taking down the ceiling frame and wall off one of the doors. The contractors are going to sheet rock the walls and replace all the carpeting.
**FYI - contractors still have not started**