Wednesday, November 30, 2011

Day 3

Well just drove by the house on the way to school, and well no one there. Hopefully the project manager and the subcontractor made it to the house.... Sure would like to see some work take place.

Tuesday, November 29, 2011

Day 2

Well drove by the house on the way to get Andrew from school, and it looks like the contractors haven't been over. No dumpsters yet outside!!!!

After talking with my dad, I found out no one had been to the house today. So I called the contractor, and he said he would be at the house tomorrow with the subcontractor. He also said he'll have a list for me Thursday or Friday. That way construction can start either friday or Saturday.

Monday, November 28, 2011

Day 1 - take two

Today I met the contractor and movers at the house..... They are moving things out this morning, and then the project manager is going to meet with the subcontractor this afternoon... Yippee!!

Tuesday, November 22, 2011

Day 1 update

Well day 1 did not start yesterday as planned.... The project manager called mom this morning, and told her that they will be over Monday morning to move things out along with starting construction.....

So now to wait until Monday!

Monday, November 21, 2011

Day 1

Today John and I finished putting up the wall. Plus my parents finished moving everything out for the construction movers to come and get.... They should be over sometime after 2pm...... Then construction demo begins tomorrow hopefully!!!

Walls up

Walls are going up in bedroom b &c

Thursday, November 17, 2011

Contracts

Today mom & dad are going to sign the contract with the contractors. With this being done, construction will start next week.....

Wednesday, November 16, 2011

Monday, November 14, 2011

Kitchen before picture

Contrators are coming

Mom talked to the contractors this morning, and they told her they can come out to the house start next week to start work........ So if that is what happens and they keep to estimated work time (6 weeks), the house (contractors part) should be complete the first week in January....... I am hoping so because I am planning on using the house for Meadow 5th birthday party at the end of January :)

Sunday, November 13, 2011

House Thoughts - update

House thoughts

1. Running toilet & shower in downstairs bathroom

2. Flooring in upstairs bathroom
2a. New shower walls upstairs
2b. Remove side wall of little closet to make it more open

3. Fix central heat and air in house

4. Garage doors

5. New lights fixtures throughout house (except downstairs bathroom)
5a. New fixture on front & back porch

(DONE) 6. Two small rooms into 1 large room
6a. New closet for new room

7. Expand master bedroom closet

8. New banister up the stairs & hallway

9. Seal off balcony doors and pull down balcony

10. Privacy fencing both sides of yard (upper only)
10a. Privacy fence the front and run fencing up driveway

11. Replace chain fence in backyard

12. Get rid of all brush in backyard and start growing grass

13. Patio off back door
13a. New back door (possibly glass)

14. All junk on sides of house must go and start growing grass again

15. Appliances in kitchen - frig, stove, dishwasher

16. New front loading washer & dryer set

17. Laundry platform (see pinterest acct)
17a. Laundry cabinet storage (see pinterest acct)
17b. New doors for laundry area

18. Front porch roof fixed

19. Swimming pool in backyard for kids!!!!!!
19a. Deck around pool

20. Puppy for Andrew & John

21. Remove all bushes and plants along front of house
21a. Plant either hedges along front of house or some type of rock flowers garden

22. Put shelves in end closet for extra storage
22a. Put door on closet

23. Build a storage bench under window in upstairs hallway

24. Alarm system
24a. Smoke alarms/carbon monoxide detectors
24b. New locks on doors

25. Door bell

26. New front door

27. Clean front window

28. Either replace or paint all baseboards, beams, and trim work

29. Clean fireplace
29a. Repaint brass doors
29b. Update mantle

30. Paint outside of house
30a. Paint kitchen one color
30b. Paint living room, stairs, hall, & bathrooms one color
30c. Andrew room - paint grey with OU vinyl accents
30d. Meadow room - paint light purple with butterfly vinyl accents
30e. Office room -
30f. Master room -

31. Ceramic Flooring in kitchen & downstairs bath matching (possibly match upstairs as well)

32. Multiple four wheelers

33. Cut sunroof hole
33a. Possibly put in second sunroof on opposite side

34. Change track lights to ceiling mounts

35. Install bead board in office
35a. Instal bead board in kitchen

36. Programmable thermostat

37. Convert front closet to mud room

38. Replace or paint all bathroom fixtures (sink, tub, downstairs light)

It has started

Well, it has started...... Today John, the kids, and I began demolition upstairs in Bedroom B & C. Our plan is to take down the closets between the two rooms along with walling up one of the hall doors. This way it becomes one large room for Meadow.......

As you can tell from the pictures the frame of the closet is now gone. We just need to finish taking down the ceiling frame and wall off one of the doors. The contractors are going to sheet rock the walls and replace all the carpeting.

**FYI - contractors still have not started**